Methods

Our Method

Our Method statement

DOCUMENT CONTROL

The company has established and maintains a system of documentation to ensure effective monitoring and controlling of initial and final stages of activities in shop fabrication and installation.

FABRICATION AND INSTALLATION CONTROL

  • The company fabrication activities are carried out under controlled conditions, which include proper welding procedures, work instructions and all necessary qualification verifications.
  • The workshop supervisor shall ensure that all applicable manuals procedures and work instructions are made available to the persons involved in the work.
  • The workshop supervisor ensures that all activities are carried out as per the work instructions and procedures specified.

PURCHASING

  • The company shall ensure that all materials procured shall conform to the specifications applicable to the respective job and also meet the requirement specified in the tender/contract.
  • The store keeper prior to acceptance from suppliers inspects all materials received. These materials will be stored against individual job number and will be issued for fabrication on request/instruction from shop supervisor.
  • The materials required for each job is identified and the shop supervisor prepares a requisition. The available stock is checked against this requirement and necessary action is initiated to procure the materials required, to meet the job requirement.
  • The purchase orders shall be in writing and a list of orders placed against each job is maintained and the same will be used to monitor the material order/receipt status

CUSTOMER SUPPLIED MATERIAL

Fabrication drawings/ documents and detailed material specifications etc. will be at the disposal of the clients and his authorised representatives.

Quality control engineer will establish and maintain complete list of documents applicable to all items being fabricated in accordance with the fabrication specifications.